Special Equipment Administrative License
Special Equipment Administrative License
We are a steel pipe manufacturer that produces pressure pipes and pressure steel pipes. Frequently, customers ask: Do you have special equipment licenses? Is there a pressure vessel production license? Let's talk about what this license is today.
Announcement of the General Administration of Market Supervision on Matters Relevant to Administrative Licenses for Special Equipment (No. 3, 2019, hereinafter referred to as “No. 3 Announcement”), “Special Equipment Manufacture and Filling Unit Licensing Rules” (TSG07-2019, hereinafter The new licensing rules ") have been implemented since June 1, 2019. In order to further implement the No. 3 Announcement and the new licensing rules, and standardize the administrative licensing work, in response to the more concentrated issues during the implementation process, the Office of Special Equipment Administrative Licensing of the General Administration of Market Supervision answers the following questions:
one.Pressure vessel
(1) Test design documents for pressure vessels.
1. The design of fixed pressure vessel rules is not divided into levels, and the certification (renewal and addition) units should prepare trial design documents for large high pressure vessels, medium and low pressure vessels, and spherical storage tanks, while meeting the new permitting rules "Table C-1" It is not required to prepare trial design documents for ultra-high pressure vessels (even if trial design documents for ultra-high pressure vessels are provided, the license does not separately state that they contain ultra-high pressure vessels). If the trial design documents include non-metallic pressure vessels, the permit shall state "containing non-metallic pressure vessels".
2. The design of mobile pressure vessel rules is not divided into levels, and the certification (renewal, addition) unit shall prepare trial design documents for a total of 5 varieties of railway tank cars, automobile tank cars, tank containers, long tube trailers, and tube bundle containers.
3. Attachment A to the new permitting rules, “Instructions for Filling in Special Equipment Production Licenses,” Article 4 refers only to the design of pressure vessel rules, not including pressure vessel analysis design (SAD). A manufacturing unit that has the ability to design rules and only designs its own pressure vessel products, if it can meet the permit conditions for the pressure vessel analysis and design (SAD) subproject, it can engage in the analysis and design (SAD) of products manufactured by this unit. Note on the license Bright. The analysis and design approval personnel of the unit must pass the on-site ability assessment of the appraisal agency, and should prepare at least one set of analysis and design documents.
4. Before the pressure vessel manufacturing unit obtains the manufacturing license qualification, its trial design documents shall not be used for trial production of the tested product.
(2) Trial-produced products for pressure vessels.
1. The original A2 pressure vessel manufacturing unit can apply for a renewal of the D-level production license according to the provisions of the license renewal. The resource conditions, manufacturing performance or trial production of the original D1, D2 pressure vessel manufacturing unit should meet the requirements of the new licensing rules. , Can only be issued a D-level production license, otherwise the license remarks "limited to the first and second category of low-pressure vessels".
2. Units that only manufacture single-layer pressure vessels, the license does not indicate "high-pressure vessels limited to single-layer". Units applying for or adding new items to manufacture typical products listed in the new license rule "C2.1.7 (3)" should prepare corresponding trial products. The license remarks "include (or limit)", which has the production capacity of multi-layer pressure vessels The unit should manufacture the corresponding trial products and have at least the resource conditions of hot-sleeve (bandaging or wrapping) pressure vessels.
(3) Resource conditions of pressure vessel production units.
1. The pressure vessel design approval personnel should use the national unified test bank to pass the online examination. The design experience and performance of the designer are confirmed by the appraisal agency based on the relevant materials provided by the design unit.
2. The pressure vessel manufacturing unit should meet the basic conditions and corresponding special conditions at the same time. When work is allowed to be outsourced, the manufacturing unit should still have the production equipment required by the special conditions; equipment that is not really needed in the product manufacturing process can be made without requirements. The unit should make an explanation when applying, and the appraisal agency will make it clear in the appraisal report (for example, a large high-pressure container production unit that only produces multi-layer bandaging containers does not need a 150mm plate rolling machine, and the rolling capacity can meet the product requirements).
3. For the addition of mobile pressure vessel and gas cylinder filling licenses, the applicant shall provide relevant documents in accordance with the requirements of the renewal unit in the "Note C-11" and "Note D-7" of the new license rules. The “Planning Permit” in “Note C-11” and “Note D-7” may also be planning-related certification documents issued by the planning department of the local government.
4. Welded and non-welded heads can be purchased separately; Article 6.1.2.1 (3) of the “Safety Technical Supervision Regulations for Fixed Pressure Vessels” (TSG21-2016, hereinafter referred to as the solid capacity regulation) lists them separately and leaves the factory. When outsourcing other components, it can only be used to repair and modify the pressure vessel in use.
5. For spherical tank (A3) manufacturing unit, sub-contracting of spherical shell plate is allowed; if it does not have the ability of spherical shell plate pressing, the license remarks "excluding spherical shell plate pressing".
(4) On-site manufacturing of ultra-large medium and low pressure non-spherical containers.
1. Units that have obtained evidence before the implementation of the new permit rules, and have on-site manufacturing performance within 4 years, but units that have not yet reached the renewal period can sign the on-site manufacturing project contract in accordance with the "General Administration of Market Supervision General Office on Special Equipment Administrative Licensing Related Matters" "Implementation Opinions of the People's Republic of China" (City Supervision [2019] No. 32, hereinafter referred to as "Licensed Implementation Opinions") required the submission of change materials to the issuing authority of the original certificate, and the license remarks "including on-site manufacturing".
2. Units engaged in the on-site manufacturing of ultra-large medium and low pressure non-spherical containers do not require trial production of spherical tanks (A3). The unit should have A1, A2, or D pressure vessel manufacturing qualifications and meet the basic and special conditions for spherical tanks (A3) (excluding the requirements for qualified welders), or have spherical tank (A3) manufacturing qualifications and meet A1, A2, or The basic conditions and special conditions for D-level pressure vessel manufacturing units, or both the corresponding levels of pressure vessel and spherical tank (A3) manufacturing qualifications.
(5) Special seals for the design of pressure vessel production units.
The special seal for the design of the pressure vessel production unit may be used in its original form, and its content shall meet the requirements of the solid capacity regulations. Units that are only designed for pressure vessels manufactured by their own units shall issue design documents that comply with the requirements of the solid capacity regulations for stamping, and the unit name and license number of the special seal for design shall be consistent with the special equipment manufacturing license.
Two.Pressure pipes, pressure pipe components and safety accessories
(6) The special seal for the design of the pressure pipeline design unit may be extended to the original style.
(VII) Refer to the appendix for the reference table of pressure pipe component trial production products.
(8) Forged fittings, polyethylene fittings, pressure pipe flanges (steel forged flanges) in pressure pipeline components, and gas pressure regulators, temperature reduction and pressure relief devices, flame arresters, and flow meters in component assemblies (Shell), factory-made prefabricated pipe sections are not divided into levels.
(9) At present, manufacturers of imported pressure pipeline pipes and valves can apply for pressure pipe component manufacturing licenses in accordance with Announcement No. 3, or they can continue to follow the Announcement of the General Administration of Quality Supervision, Inspection and Quarantine on Manufacture of Pressure Special Equipment (2012) No. 151) Type test.
(10) Seamless steel pipe, welded steel pipe, non-ferrous metal pipe, ductile iron pipe, metal-metal composite pipe, non-metal and non-metal composite pipe, non-metal material pipe, seamless pipe fitting, seam pipe fitting, pressure pipe component, Metal and metal composite pipe fittings, non-metal and non-metal composite pipe fittings, non-metal pipe fittings, metal valves, non-metal valves, metal corrugated expansion joints, rotation compensators, non-metal expansion joints, metal sealing elements, non-metal sealing elements, anti-corrosion pipes Components, wellhead devices and Christmas trees, throttling well manifolds, flame arrestors and safety valves, emergency shut-off valves, bursting disc devices, gas cylinder valves in safety accessories shall be type tested in accordance with relevant safety technical specifications and standards. Those who have not undergone type test must not leave the factory.
Three.Elevator
(XI) Attachment 1 of the License Implementation Opinions "Correspondence Table of New and Old Production Units Licensed Items", the corresponding relationship between the original license level of the elevator and the new license level has been listed. If there is a corresponding relationship, it does not belong to the "replacement ratio" stipulated in the license implementation opinions. "The license level parameter is high or the license range is widened." (For example, the original permission level of the elevator is "traction-driven passenger elevator C", and the corresponding new permission level "traction-driven passenger elevator B" does not need to apply for a new certificate (or additional item)).
(12) For a unit that has obtained an elevator manufacturing (including installation, repair, and transformation) license, sub-project licenses for installation (including repairs) beyond the scope of the license shall be separately applied to the local provincial licensing authority.
Four.Lifting machinery
(13) In accordance with the provisions of Announcement No. 3 and the new permit rules, the permit parameter column and remark column of the permit will be marked as follows:
1. If the original license is directly changed, it can be limited according to the items of the original certificate during the change process. If the original license only has bridge cranes and meets the current A-level scope, the bridge and gantry crane (A) permission sub-item will be given directly when the certificate is renewed, and the "limited bridge crane" will be marked in the remarks; If there is only a tower crane in the permit, the tower crane and lift will be granted a sub-item when the certificate is changed directly, and the "Limited tower crane" will be marked in the remarks.
1. If the original license is directly changed, it can be limited according to the items of the original certificate during the change process. If the original license only has bridge cranes and meets the current A-level scope, the bridge and gantry crane (A) permission sub-item will be given directly when the certificate is renewed, and the "limited bridge crane" will be marked in the remarks; If there is only a tower crane in the permit, the tower crane and lift will be granted a sub-item when the certificate is changed directly, and the "Limited tower crane" will be marked in the remarks.
2. If the license obtained before the implementation of the new licensing rules is changed to a new license format for review, or for additions or renewal reviews, the review and certification shall be conducted in strict accordance with the requirements of the new licensing rules. Licensed subprojects are restricted. For example, "Bridge and gantry cranes (A)", do not mark "Limited bridge cranes" or "Limited gantry cranes" in remarks; "Tower cranes, lifts", do not mark "Limited tower cranes" in remarks "Or" Lift Only ".
3. The "permission parameters" of the license shall be marked in accordance with the parameters specified in Announcement No. 3 and shall not be restricted in addition.
Five.Dedicated motor vehicles in the field (factory)
(14) The "assembly workshop lifting equipment" specified in the special conditions for the manufacture (including modification and repair) of special motor vehicles in the field (factory) refers to lifting machinery and cannot be replaced by a forklift.
Six. Other matters
Six. Other matters
(15) Non-destructive testing related majors in the new permit rules generally refer to non-destructive testing, machinery, metal materials, welding and other majors.
(16) Prior to the implementation of the new permit rules, special equipment manufacturing units simultaneously hold two or three licenses for the design, manufacture, installation (retrofitting, repair) of the same type of special equipment, and one of the licenses expires and is replaced, Can apply for another license at the same time.